Site Map  
Home ] Layout Area ] Laminations ] Mechanical Installation ] Deck Framing ] Seating and Interior ] [ Site Map ] Tools and Shop ] Schedule ]

 

Framing

 Layout Area and Frame Part 1

 Transom frame

  Boat Frame Part 2

  Long Pieces

  Completed frame

  Fairing the frame

  Deck framing 

  Hatch Framing

Mechanical and Seating

  Engine Installation

  Engine Connections 

  Electrical

 Water and Plumbing

  Interior and Floor

  Seating and Interior

 Driver's and Spotter's Seats

Reference

  Books and training

  Schedule

  Budget  

  Suppliers

  Why did I do this?

  Other Links

 

Planking

  Laminations

  Stapling

  Planking final layer

  Chine fitting of planking

  

Tools and Tips

  Scarf sled  

  Router jig for cutting batten slots

  Tools and Shop

  Tool Care Tips

  Sanding Tools

 

Miscellaneous

  Fiberglass and Paint

  The Move

  Home

  Mistakes

  Changes to Make

  Wood Projects

 Strip and refinish

 Epoxy repairs

 Imron clear coat

Decking

  Deck framing

  Decking

  Decking Part 2

  Decking Fiberglass

  Engine Hatch and Hardware

 

Hardware

  Engine Hatch

  Trim and Rub Rail

 Swim Platform

  Wakeboard Pylon

Running

  On the water

  Ski and board

  Wakeboarding

 

If you can't find it above, search here: 
Note: if you followed in an old link, first go to: www.bronkalla.com and update your links.  The search box may be visible, but won't work otherwise.
 

This page last updated 10/16/04                        ©2000- 2004 Mark Bronkalla